General Scope:
- Contractor Obligations: The contractor will construct the Abu Arish 132/13.8 kV Substation, including modifications and additional works at connected substations.
- Design and Engineering: The contractor will handle all stages of design, engineering, procurement, and installation of electrical equipment, as well as conduct testing.
- Equipment: Installation of 132 kV Gas Insulated Switchgear and other related devices.
- Project Value: SAR 41,794,500.