• Abha, Saudi Arabia

Project Overview

  • Project: Abha Airport Dual Road (4046)
  • Client: Ministry of Transport
  • Project Value: 152,206,453 Saudi Riyals
  • Project Status: Completed
  • Location: Abha
  • Project Type: Roads and Dismantling Rocks

Project Details:

  • Road Excavations: 2,383,664 cubic meters
  • Bridge: 1,908,521 cubic meters
  • Sub-grade: 207,264 cubic meters
  • Stone head coat MC-1: 393,528 meters Square
  • Asphalt base layer: 32,794 cubic meters
  • Asphalt playground: 16,977 cubic meters
  • Concrete for superstructure bridges: 4,881 cubic meters
  • Concrete for bridge infrastructure: 5,012 meters Cubic
  • Concrete for box bridges and Irish crossings: 15,534 cubic meters

This project represents a significant improvement in the infrastructure of the city of Abha, by creating a dual carriageway linking the airport In key areas. The project covered a wide range of engineering activities including excavation, construction, and road paving, enhancing traffic efficiency and providing a safe and comfortable route for travelers.