Abha, Saudi Arabia
Project Overview
- Project: Abha Airport Dual Road (4046)
- Client: Ministry of Transport
- Project Value: 152,206,453 Saudi Riyals
- Project Status: Completed
- Location: Abha
- Project Type: Roads and Dismantling Rocks
Project Details:
- Road Excavations: 2,383,664 cubic meters
- Bridge: 1,908,521 cubic meters
- Sub-grade: 207,264 cubic meters
- Stone head coat MC-1: 393,528 meters Square
- Asphalt base layer: 32,794 cubic meters
- Asphalt playground: 16,977 cubic meters
- Concrete for superstructure bridges: 4,881 cubic meters
- Concrete for bridge infrastructure: 5,012 meters Cubic
- Concrete for box bridges and Irish crossings: 15,534 cubic meters
This project represents a significant improvement in the infrastructure of the city of Abha, by creating a dual carriageway linking the airport In key areas. The project covered a wide range of engineering activities including excavation, construction, and road paving, enhancing traffic efficiency and providing a safe and comfortable route for travelers.